citic heavy cast iron workshop

project description: this project in 2009 to obtain the china construction steel award, the construction scale of 44712 square meters. the project has six spans, respectively for a total of seven axis of a-g, b and c axis for two-layer corbels lattice structure column, e, f two axis for monolayer niuge structural column and the rest a, d, g three axis for h section. in addition to each of the 50 tons of crane (a6), in which the bc cross layer is 125/32t (a7) two, the upper level is 200/50t, 200/32t (a7) two; ef is a single cable car, the crane tonnage is 200/50t, 200/32t two. the factory production niuge pillar bracket at the maximum cross section of 4125mm * 750mm, the maximum height of 30.6 meters, the largest single component weighs about 27 tons. the total amount of the project is about 7263.68 tons.